First residential project built by New Century Companies, which to date is the largest and most complete urban development project being executed in Nicaragua, with a total land area of 130.6 blocks, where 5,000 homes of various models have been developed, currently continues to expand and innovate with its offer.
The construction systems used to build the homes are monolithic concrete and earthquake-resistant brick. El Doral offers all basic services: security, electricity, drinking water, stormwater drainage, sanitary drainage, telephone service, cable television, terraces, and large green, commercial, and communal areas for the enjoyment and recreation of its residents. Additionally, it has a main boulevard, a soccer field, wide avenues, and hydraulic concrete streets.
The drinking water supply system is connected to two drilled wells, an above-ground tank, and an above-ground tank, providing excellent drinking water service.
On the other hand, the wastewater that will be generated in the project is of a domestic nature, which is conducted through a sanitary sewerage network to a treatment plant, undergoes a purification process and is transferred to a receiving body, thus complying with national and international standards such as: WHO, Drinking Water Quality Standards in the Americas (CAPRE) and the Nicaraguan Institute of Aqueducts and Sewerage (INAA).
atencionclientes@newcenturyni.com
+505 5870 7940 +505 2267 8600
Km 18 carretera nueva a León, Managua
The images, plans, text, and measurements contained in this document are for reference purposes only and therefore do not represent the final project nor constitute part of a legal document related to this property. New Century reserves the right to make modifications and improvements to the project. Prices are subject to availability.